ngocnhi5987 ngocnhi5987
  • 24-10-2017
  • Business
contestada

Johnson's rule gives optimal answer for what type of scheduling problems?

Respuesta :

Etta217
Etta217 Etta217
  • 06-11-2017
The answer is two-machine flow shop. The two-machine flow shop issue in which each activity is prepared through an in-house framework or outsourced to a subcontractor. A calendar is set up for the in-house employments, and execution is measured by the makespan.
Answer Link

Otras preguntas

Caesar freely confessed to me that the greatest actions of his own life were not equal, by many degrees, to the glory of taking it away. I had the honor to have
Which answer describes the transformation of g(x)=log4(x−2)+4 from the parent function f(x)=log4x? It is the graph of f(x) shifted 2 units right and 4 units up.
• Identify where Moisturizing Black Soap Shampoo is currently positioned in the product life cycle. Underline your selection: • Introduction • Maturity • Growth
Create a claim about Muhammad, his life, and accomplishments.
Explain how sectional voting patterns in the 1860 presidential election allowed southern “fire-eaters” to justify secession.
What policy did the United States adopt toward the Philippines after the Spanish-American War? The United States granted the Philippines independence but rese
)Body responses during exercise include increased hunger level higher anxiety decreased heart rate heavier breathing
what does admire mean and not admire mean?
The range of f(x) = l-xl is?
Can someone plz help me?