  • Mathematics
contestada

How much time will (4,10,14,16,18) workers take to do the job?

Respuesta :

Аноним Аноним
  • 21-06-2017
In this problem, the number of workers working on a single project should be inversely proportional to the time needed to finish the project. In this case, the function should be f(x) = 1/2^X. Hence with x equal to {4, 10, 14, 16, 18}, then f(x) is equal to {0.1, 0.4, 0.6, 0.8, 0.9}
Answer Link

Otras preguntas

what is 0.57 to the nearest tenth
Which of the following is a reason why some Indian opposition campaigns proved unsuccessful against Arab forces?
How long is the image of a metrestick formed by a plane mirror?
if two young people of the same age commit the same crime, would you expect them to face the same consequences. yet, under the ycja they may or they may not. to
when economist use the term laissez-faire what economic idea are they referring to
how did the great compromise meet the needs of both large and small States
Is a carbohydrate or a lipid more likely to be a good source of energy for an organism? Why?
Which laws directed the flow of goods between england and the colonies? A) Navigation Acts B) Merchant's Pledge C) Colonists' Rights Law D) Colonies' Char
A line passes through the point −10,9 and has a slope of 12 . Write an equation in slope-intercept form for this line.
how many electrons does zinc lend?