All the members of a construction crew work at the same pace. Six of them working together are able to pour foundation in 22 hours. How many hours would this job take if the number of workers: increased 2 times

Respuesta :

linsleepotato
linsleepotato linsleepotato
  • 25-03-2017
Draw a picture if you are a visual person if not then just do 22 divided by 2 and I got 11hrs
Answer Link

Otras preguntas

The part of the brand ______________________________ is the symbol or design.
List 4 ways that the new middle class in america spent their extra income and free time​
Toro introduced a small, lightweight snowblower called the Snow Pup, which worked very well. Toro later found out that consumers perceived the name to mean that
help with question 68 ASAP​
Name the sets of numbers to which 1.86 belongs A. Rational numbers, irrational numbers B. Rational numbers C. Natural numbers, whole numbers, integers, rationa
define capitalist democracy​
125 feet in 5 seconds? (ratios)
Help me with this question please?? Thank you so much!! (:
In a molecule, such as the one shown, two or more atoms can share ___________ in a chemical bond Question 2 options: Electrons Protons Neutrons Metals
WHAT IS THE ATOMIC NO OF RUBINIUM[RB]