rasiata6ylangerar rasiata6ylangerar
  • 26-01-2017
  • Computers and Technology
contestada

Which software development team member would make the most use of the tool, Load Runner?
A.) software engineer
B.) programmer
C.) business analyst
D.) tester

Respuesta :

Greenleafable
Greenleafable Greenleafable
  • 04-02-2017
Given that Loadrunner is a software testing tool, I'm assuming that the software development team member who would make the most use of that tool is A. a software engineer, because that is the person who creates software and then tests it. 
Answer Link
1valordiv1 1valordiv1
  • 26-01-2021

Answer:

D) Tester

Explanation:

Load runner is something testers use.

Answer Link

Otras preguntas

A sample of methane gas that has a volume of 3.8 L at 5°C is heated to 86°C at constant pressure. Calculate its new volume.​
Pls help! I don’t understand bc I’m not smart-
Math Please answer the question please and thank you.
!!!!PLEASE HELP!!! !!!!!PLEASE EXPLAIN HOW YOU GOT THE ANSWER!!!! Two boats start their journey from the same point A and travel along directions AC and AD, as
Rapid industrialization led to: 1: a decline in the human population. 2: an increase in the consumption of fossil fuels. 3: a rapidly cooling global climate. 4;
1 point What is the x component of a vector that is defined as 852m at 302°?
Driven by the storm, we took shelter under a bridge​
Some Deaf people argue that there is a global effort to eradicate deaf people from the human gene pool? Do you agree? Explain your thinking.
Amy drives 300 miles from London to Newcastle. She drives the first 165 miles at an average speed of 60 mph. From this point it takes Amy 3 hours and 5 minutes
Kindly answer it please​