30men can finish 1/7of a work in 2days.18men will do othe remaining work in ?

Respuesta :

chumxo chumxo
  • 24-09-2016
7/7-1/7=6/7 is the rest of work
1/7 work takes 2days
6*1/7=6/7 work takes 6*2days=12days
30 men takes 12 days to finish the rest of work (6/7)
18 men takes 18*12/30= 7.2days
Answer Link

Otras preguntas

What is the most current NASA mission on Mars?
Q2. In a 4x100 m relay race, total track length is 200m and time taken by one particular group is 50.2 s. What is the average speed and average velocity of that
If -nx2 + tx + c = 0, what is x equal to?
where are the largest gold deposits found?
can you guys help me out with number 13
what do you call a baby zebra?
what is elevator music?
1)simplify the expression (2x)^42)the perimeter of a rectangular is twice the sum of its length and its width. the perimeter is 16 meters and its length is 2 me
a hydrogen-filled balloon was ignited and 1.60g of hydrogen reacted with 12.8g of oxygen. how many grams of water vapor were formed? (assume that water vapor is
1. In a certain county, the number of Charter Schools is eleven less than twice the number of Alternative Schools. There are 35 Charter Schools in the county. W