kcutler3009 kcutler3009
  • 22-10-2019
  • Business
contestada

The __________ is the fifth of five phases of a project. This is the phase in which the project manager or team confirms the final outcome, conducts a postimplementation meeting to critique the project and personnel, and reassigns project personnel

Respuesta :

Аноним Аноним
  • 31-10-2019

Answer:

Postcompletion Phase

Explanation:

Answer Link

Otras preguntas

Line a passed through points (-2,1) and (2,9). Which is parallel to line a?
Why do you think after the war is over, the next era (Reconstruction) will be extremely violent and difficult?
BRO SOMEONE PLEWSE HELO ME WITH THIS ONE
IS (1, 2) of a solution set of x+ y = 3 and 2 x + 7 y = 16 ?​
9+9y=9y-9=9(y-1)=9(y+1)=9y+1=1+9y=​
Which mechanism of evolution is caused by a population moving to a secluded mountain valley that is cut off from any other populations? Natural selection Mutat
What is one characteristic of an anecdote?
Find the density of an object that has a mass of 66 g and a volume of 10 cm? a.)660 g b.)6.6 g/cm^3 c.)0.15 cm 3/g d.)6.6 cm 3/g
(a/b)^2 simplify need help
Aluminum reacts with oxygen to produce aluminum oxide. If I give Tanya 3.2 grams of aluminum, how many g of oxygen does she need??Al + O2 ---》 Al203​