odeDanienan
odeDanienan odeDanienan
  • 23-04-2016
  • Business
contestada

Based on the following information, what is the Order Point? Lead Time = 3 Weeks Demand/Week = 200 Units Safety Stock = 1 Weeks’ Supply Lot Size = 100 Units

Respuesta :

mulakalav
mulakalav mulakalav
  • 23-04-2016
I don't know by what you meant
Answer Link

Otras preguntas

what events happened beforeloyalists left boston and philadelphia?
what is the difference between dividing 16 by 2 and finding the square root of 16
If4 times the reciprocal of a number is 3 more than 5/2 times the reciprocal of that number find the number Show your work
The equation s x  2 5 can be used to estimate the speed, s, of a car in miles per hour, given the length in feet, x, of the tire marks it leaves on the ground.
What is the simplest form for the product 3/5 •25/36 is?
what is 4 over 9 minus 1 over 12 equal simplified?
what is the difference between dividing 16 by 2 and finding the square root of 16
what is the difference between dividing 16 by 2 and finding the square root of 16
What is the simplest form for the product 3/5 •25/36 is?
The equation s x  2 5 can be used to estimate the speed, s, of a car in miles per hour, given the length in feet, x, of the tire marks it leaves on the ground.