ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

The natural history had a hands on mineral presentation. Each time the presentation is given 8 student are permitted in the area One day 100 student were at m
Light is an example of what in an ecosystem?
Choose the appropriate pronoun. Steve made friends _____ later worked with him. which who
Antibodies are produced by: a. saliva b. neurons c. lymphocytes d. bacteria
What is the outermost part of the sun’s atmosphere called? a. convection zone c. corona b. chromosphere d. photosphere
Why is it relatively rare to observe a solar eclipse
The rate of soil formation cannot be increased. Please select the best answer from the choices provided T F
The electron transport process makes water and ATP and is sometimes called___________, because it requires oxygen.
If 160,000÷n=4 then what is n?
Parts of the party platform in the form of issues that are presented to the people such as civil rights, taxes, and energy are called: candidates campaigns plan