ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

A construction company can remove 2/3 tons of dirt from a construction site each hour . how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Americ
Americ Americ
  • 22-06-2018
Set up a ratio to compare the two proportions.

x= number hours to remove 30 ton


(2/3 ton)/ 1 hour= (30 ton)/(x hours)
cross multiply

(2/3)(x)= (1)(30)

2/3x= 30
divide both sides by 2/3

x= 30 ÷ 2/3
to divide by fraction, multiply by reciprocal of 2/3

x= 30 * 3/2
multiply numerators

x= (30*3)/2

x= 90/2

x= 45 hours


ANSWER: It will take 45 hours to remove 30 tons of dirt.

Hope this helps! :)
Answer Link

Otras preguntas

What is the value of the function y = 3x - 1 when x = –1? A. –8 B. –4 C. 2 D. 6
Why did the Dutch baroque movement differ from baroque movements in France, Spain, and Italy? Dutch artists used different techniques. The Dutch were protestant
How did Europeans affect the culture of Latin America?
Jill fish weight 8 times as much as her parakeet . Together they weigh 63 ounces how much does Jill fish weigh
How many time does three go into 4356
stable isotopes usually have a ____ number of protons and a ____ number of neutrons
the exchange rate is : £1 = $1.54 how many £ would you get for $77
Read the excerpt from "Dwaina Brooks.” Dwaina tore into the house that night after school and found her mother, Gail. As usual, she was in the kitchen. "Mama,"
Which group of metals plays a pivotal role in thesmartphone?
The cartilage which divides the nose in two parts is called the ?