nnjjjkkkjnj7874 nnjjjkkkjnj7874
  • 22-05-2018
  • Business
contestada

If a project has a positive net present value the expected rate of return for the project is

Respuesta :

MrsTriplet MrsTriplet
  • 31-05-2018
If a project has a positive net present value the expected rate of return for the project is greater than one. NPV stands for net present value PV. NPV is a formula used to find revenue minus cost within a firm. Using the net present value firms can figure out the value of revenues and how their cash flow is doing. 
Answer Link

Otras preguntas

George C Marshall is important to which century of American History A. 17th B. 18th C. 19th D. 20th
What is the scientific name for the layer of gas that surrounds the Earth
which achievement is mostly closely associated with mansa musa of mali?
what kind of rainfall woulf you expect on the leeward side of a mountain?
Which of the following is most likely to be amorphous? -glass -solid sulfur -solid calcium -gold
How does Galarzo best capture the competence of his teacher, Miss Ryan, in the excerpt from Barrio Boy? A. He recalls how she allowed her students to teach her
The cold war space race was between-?
what is the domain of the function f(x)=2x+5? A. all real numbers except 2 B. all real number C. all real numbers except 5 D. all positive real numbers
A student solved this problem and said the answer was 2 1 1/2 miles. Colin rides his bike 10 1/2 miles every morning and 12 1/4 miles every afternoon. On Mo
What makes up most Hindu art?