landonbradford8982 landonbradford8982
  • 23-05-2023
  • Mathematics
contestada

The estimated quantity of coarse aggregate (gravel) in (m3) of the floor concrete (1:2:4) that has 0.10 m thickness is about: 2.0 O 2.8 4.3 O 3.4 A 1.4m w 0.12m → 4.2m Roofing layers: Concrete tiles

Respuesta :

Otras preguntas

correct choice??? bio
I need help in a bad way. I need to write a short composition in SPANISH about my favorite foods
Which of these is NOT a social cause that a nonprofit could serve? A. religion B. charity C. education D. capitalism PLEASE ANSWER!
What is the length of a square park whose area is 64 m2 - a) 8m b) 16m c) 4m​
Help help please please
HELP RN PLEASEEEEEE
-1/5(15x-10)=-24 solve algebraicly
Tin has the atomic number Sn (Z = 50). (a). Give its electronic structure (b). Is it one of the transition metals? (c). Knowing that it loses its electrons in
9. She doesn't drive. Mia must walk or take the bus to work. a. She doesn't drive, Mia must walk or take the bus to work. b. She doesn't drive and Mia, must wal
Write an analysis of the poem "I wandered lonely as a cloud" and how can you incorporate the learning of the poem with your life.WORD LIMIT IS 400 WORDS