razibd60 razibd60
  • 22-09-2022
  • Mathematics
contestada

G and Z can do a work in 12 days (together). G can work alone in 20 days. so how many days it will take Z to finish the work alone?

answer will be 30 days. please show calculation

Respuesta :

Otras preguntas

find the reference angle for -782°​
What number is 20%of 40
Find the 11th term 64,-32,16,-8
It carries out instructions to operate the computer
which of these tables represents a linear function
A man travels 600km partly by train and partly by car. If he covers 400km by train and the rest by car, it takes him 6 hours and 30 minutes. But if he travels 2
Where is erosion concentrated along a meandering stream?: a) on the inner banks of the meander loops along point bar; b) at the center of a stream where water v
This is about three variable systems but i can’t figure out how to solve it.
What is the temperature if the peak of a blackbody spectrum is at 19.0 nm ?
How did the he civil war affect states rights